Gate Post Footings in Carlsbad Coastal Soil

By the time the auger hits damp clay at the bottom of a hole in La Costa, the footing depth has already been argued out. The intervals metal gates carlsbad goldies la uses for footings are deeper than a simple chart suggests, because soil in Carlsbad, CA changes from sandy loam near the coast to heavy clay a few blocks away. A gate post is only as stable as the ground around it.
Why depth follows the gate, not the hole

A post carrying a heavy swing gate acts like a lever. The farther the gate swings from the post, the harder it pulls on the footing every time it opens. A rule of thumb is to set the footing at least one third of the post height below grade, and deeper for a wide dual swing opening or a gate with an operator mounted to the post.
Sandy ground and clay ground behave differently

Sand drains quickly but gives little grip, so a footing near Carlsbad State Beach needs a wider diameter to resist leaning. Clay holds the post firmly when dry, then swells and shrinks with the wet and dry seasons, which can crack a shallow footing and pinch a gate against its latch. Where the ground stays soft near Batiquitos Lagoon, a belled footing wider at the base resists both leaning and seasonal movement.
Drainage keeps the base alive
A post cast into a footing that sits in a bowl of wet soil rusts from the bottom up. The footing top should be sloped away from the post, a couple of inches above the surrounding grade, so water runs off rather than pooling at the steel. A bed of gravel under the footing lets groundwater move away instead of soaking upward.
Why post bases corrode first
The bottom of a steel post lives in moist concrete that holds chloride from salt in the air and in the soil. A coating that stops short of the footing leaves a ring where steel meets concrete and rust gathers there. A galvanized post sleeve, a heavy coat of bitumen paint on the buried part, or a post set with a sealed collar slows this considerably.
Cure time and the first load
Concrete reaches workable strength in a few days, but a heavy gate hung too soon on a young footing will lean it. Seven days is a sensible wait before hanging a large steel panel, and longer in the cool morning fog along the coast, where concrete cures slowly.
Checking an existing post
Push on the post at the top. If it moves at the bottom, or a crack circles the base, the footing has failed. A post that sounds hollow near the soil line is probably rusting inside, and the fix is a section of new post rather than more paint.